[China Glass Network] Now our living standards have improved, and everyone pays attention to comfort and health. But health is much more than just formaldehyde. Home dust and noise are often important and invisible health killers. Heavy dust, more bacteria; loud noise, what about ease? Is it only when children and old people live that you know the importance of doors and windows in our lives, so after the renovation, the owners and friends must complete the inspection of the doors and windows, you may not know what to do. Today, Xiaobian will take you here to take a look.

Door and window installation completed check steps:

1. Drainage hole: The position of the drainage hole should be correct and at the same time smooth.

2. Switch components: Swing, push-pull or rotating windows should be closed tightly.

3. Glass sealing strip: The contact between the sealing strip and the glass and glass slot should be flat, and it should not be curled or undocked.

4. Window surface: The window frame should be clean, smooth, smooth, no scratches or bumps on the large surface, and the profile is not broken.

5, hardware: hardware must be complete, the position is correct, the installation is firm, flexible, can achieve their respective functions.

6. Sealing quality: When the door and window are half-closed, there is no obvious gap between the fan and the frame, and the sealing strip on the sealing surface should be in a compressed state.

7. Beading: The bead with sealing strip must be tightly attached to the glass. There should be no obvious gap between the bead and the joint of the profile. The joint gap should be less than or equal to 1 mm.

8. Assembling materials: The splicing materials should be tightly connected with the window frame. At the same time, they should be sealed with caulking paste and should not be shaken. The spacing of the screws should be less than or equal to 600 mm. Both ends of the reinforced steel should be firmly fixed to the hole.

9. Glass: The glass should be flat and firmly installed. There should be no looseness. The single-layer glass should not directly contact the profile. The inner and outer surfaces of the double-layer glass should be clean. There should be no dust and water vapor in the glass interlayer, and the spacers should not be lifted.

10. The frame and the wall are connected: the window frame should be horizontal and vertical, the height should be consistent, the spacing of the fixing piece should be less than or equal to 600 mm, the frame and the wall should be firmly connected, the gap should be filled with elastic material, and the surface seam seal is sealed. No cracks.